POWER UPGRADES (INFRASTRUCTURE)

Edmontme12311 Jan, 2022Business

Edmont carried out a complex and large scale upgrade to the M&E services at one of the Cotswold?s most prestigious estates. More power was required in order to facilitate the commercial activities of the estate, so following in-depth design meetings, an 800KvA was decided upon. As this exceeded the local distributors available capacity, a new HV substation was commissioned. The dedicated supply was brought into a newly built energy centre, and from there was distributed around the estate. The works involved subterranean cabling and heavy-duty switch gear to handle the current required.

Recent Profiles

24/7 Fadi Towing LLC

24/7 Fadi Towing Llc

View Profile

619 Auto Detailing

619 Auto Detailing

View Profile

Zowin

Zowin

View Profile

Nhà Cái Lucky88

Nhà Cái Lucky88

View Profile

Stratum Research Work

Stratum Research Work

View Profile

SKS INFI

Sks Infi

View Profile

Rod Walker

Rod Walker

View Profile

corteizukclothing

Corteizukclothing

View Profile

MCW link

Mcw Link

View Profile