Pinnacleinfotech04 Apr, 2020Business
Pinnacle was the BIM solution provider for the Meldahl Hydro Electric facility on the Ohio River at Foster, Kentucky. The project comprised of 3 massive Turbines producing 105 MW of power. The Meldahl project�s proposed 138kV transmission line now carries electricity to the national grid crossing the Ohio River and running 2.2 miles to an existing PJM interconnect in Clermont County.